Bar & Mixer Showers
Replacement & New Installations

Please ensure that the water can be turned off before we arrive.

Please test prior to make sure that the stop cock has not seized. Also It is not our job to know where the stop cock is !  We cannot change or install showers if we cannot turn off the water supply or cannot locate the stop cock. Failure to turn off the water means the job don't get done, wasting our time and resources - Check the stop cock works.

 Got any questions ? - Use the Chat App -bottom right

These are our PREMIUM quality Triton

- STRAIGHT SWAP  bar and mixer showers. They are a straight forward replacement with your existing worn or un-repairable shower valve. 


New pipe work installation -  local to boiler +mounting brackets £149 extra. 

* New pipe work Up and Over installation+ mounting brackets from £249 extra.


 
 

Bristan Cool Touch Supplied & Fitted From £199


Our Bristan Cool Touch bar shower comes with a 5 year Bristan warranty - It will replace your existing bar shower - We can straight swap this shower with your existing bar shower from £199


New pipe work installation - local to boiler +mounting brackets £149 extra.

New pipe work Up and Over installation+ mounting brackets from £249 extra.

 
 

Premium Triton Benito Bar Shower 


Our Triton Benito bar shower comes with a 5 year Triton warranty - It will replace your existing bar shower - We can straight swap this shower with your existing bar shower for  £259

New pipe work installation - local to boiler +mounting brackets £149 extra.

New pipe work Up and Over installation+ mounting brackets from £249 extra.


 

* What is an Up 'n' Over ?

Up 'n' Over means taking new pipe connections from your boiler or taps - Up into the loft and Over above new shower and down the wall connecting to the bar shower finishing in chrome pipe. Or if the shower location is on the ground floor the pipes would go up the wall then under bedroom floorboards and back down to bar shower where feasible.

 

Premium Triton Bar Shower + Rainkit


Premium Quality Triton Bar + Rain kit Supplied & Fitted From £339
New pipe work & brackets extra

5 year Triton warranty on this shower 

Fitted In Stoke - Play Video !

Three spray shower handset with rub clean nozzles for easy cleaning and limescale removal

This all chrome bar mixer diverter shower with quality metal handles is both stylish and safe for all the family to use.

The sleek design will add a stylish finishing touch and features easy to use separate controls for flow and temperature and diverter.

The thermostatic mixer constantly regulates the water temperature giving more precise control and safer showering - 5 year Triton warranty.



This is a straight swap with your existing bar shower - New pipe work & mounting brackets are Extra.

Up 'n' Over means taking new pipe connections from your boiler or taps - Up into the loft and Over above new shower and down the wall connecting to the bar shower finishing in chrome pipe. Or if the shower location is on the ground floor the pipes would go up the wall then under bedroom floorboards and back down to bar shower where feasible.

New pipe work installation - local to boiler+mounting brackets £149 extra.

New pipe work Up and Over installation+ mounting brackets from £249 extra.

 
 

No you didn't !

Well yes we did drill two holes through the end of the bath in order to fit a bar shower. Plastic baths only !

Obviously it is a skilled job and would not recommend doing this unless you know what you are doing.

The reason why we went to this extreme is the other end of the bath did not have a wall and had no access to space above. Our customer was fed up with using a hand shower attached to the taps and wanted a boiler shower giving twice the flow rate over electric. Plastic baths only.

PLAY THE VIDEO 


Our value thermostatic bar shower and supply pipes from under the bath supply and fitted from £349 

 

We make boiler connections all the time - Do it right..do it once !

So on our new bar shower installs we cut and machine bend the pipe work nice and neat and *solder the joints when connecting to the boiler pipes - we go onto fit isolation valves and go up 'n' over or straight through the wall to connect to a bar shower in the bathroom.

Before we leave we test the system to be certain no leaks. We have a choice of premium Triton & Bristan showers to choose from when ordering a full installation or replacement.
* We fit brass compression joints instead of soldered joints when there is a fire hazard or inaccessible pipework for a blow torch to work effectively when making the connections.

prev next
 
 

Open chat window bottom right for quotes etc or drop us an email.